Launch of Saturn V Apollo 11 from KSC LC-39A, July 16th, 1969. Watch for the shockwave as the rocket punches through the clouds at 1m 15s.
(Source: lightsinthedark.wordpress.com)
Launch of Saturn V Apollo 11 from KSC LC-39A, July 16th, 1969. Watch for the shockwave as the rocket punches through the clouds at 1m 15s.
(Source: lightsinthedark.wordpress.com)
Film of Apollo 17 liftoff, with actual sound of launch, by Mr. Dan Beaumont
Mobile Launch Platform on crawler, test roll from Vehicle Assembly Building to Launch Complex 39B at Kennedy Space Center. The MLP will be used to transport the future Space Launch System stack.
(Source: universetoday.com)
STS-123 Endeavour launch with PiP insert of Shuttle flight deck. March, 2008.
STS-65 Columbia launch with PiP insert of view from Shuttle flight deck. July, 1994.
The Space Shuttle Columbia (left), slated for mission STS-35, is rolled past the Space Shuttle Atlantis on its way to Pad 39A. Atlantis, slated for mission STS-38, is parked in front of bay three of the Vehicle Assembly Building following its rollback from Pad 39A for repairs to the liquid hydrogen lines. First motion of Atlantis from the pad was at 10:14 p.m. August 8. It arrived at the VAB at 4 a.m. August 9. First motion of Columbia leaving the VAB for the pad was at 5:47 am.
This was on 22 Aug 1990.
(Source: nasaimages.org, via asonlynasacan)
Launch of Apollo 10, the dress rehearsal mission for an actual lunar landing.
Ares I-X launch viewed from KSC near the VAB.